Top News

Torredembarra asks: What hi vols, al Bloc? Pyramid or Alpha and Omega?

What hi vols, al Bloc? This is the question that the City Council of Torredembarra addresses to the citizens in the consultation process to find the replica of which sculpture will be located: Pyramid or Alpha and Omega. THE WEB TO VOTE

Voting will remain open from May 30 to June 12. They can vote all the people who have completed the 16 years before March 1, 2022 and who are registered in Torredembarra outside of the established data. People over 16 years of age who are still owners of a second residence and, now, holders of the rebut of the IBI will also be able to vote. In this darrer cas, per a fer-ho caldrà register-se previously, between May 5 and 15, click HERE

The mayor of Torredembarra, Eduard Rovira, and the councilor for Citizen Participation, Marga Rovira, have presented here the participation process. The mayor has stated that the realization of this consultation is a mandatory commitment and that it will be the citizens who will decide which sculpture will be located on the Bloc, as an emblem of Torredembarra.

PHOTO: Anna F. – Aj. Torredembarra

In this sense, Eduard Rovira has encouraged the citizens to participate and has stressed that the result will be binding. It is not required a minimum participation and the option that exceeds 50% of the votes will be the guanyadora. From the result, he will be in charge of drafting the project and the number of clauses to adjudicate and execute.

The councilor for Citizen Participation, Marga Rovira, has highlighted that the voting calendar, from May 30 to June 12, is extended to facilitate participation. Voting takes place over the Internet at the website consulta.torredembarra.cat and also in person.

For this option, a total of six points have been enabled (Seu de l’Ajuntament, Mestra Maria Antònia Library, Biblioplatja, Tourist Office, Sant Jordi Municipal Pavelló and Antoni Roig Patronage) on which citizens will be provided with a tauleta device why pugui cast the vote. It has also designed a communication campaign for the public in general through street graphics, media outlets and social networks, and also addressed to more specific groups to get the information and material of the campaign to the families with students, the educational centers of the municipality, the associations of neighbors and neighbors, the property administration offices, etc.

PHOTO: Anna F. – Aj. Torredembarra

The central point of the process is the web platform that has been created: consulta.torredembarra.cat with detailed information about the process, here with the due options, because the citizens have information to decide their vote:

new pyramid

  • It is made up of a pyramidal structure 5 meters high and approximately 1,300 kilograms. It is proposed to manufacture it in carbon steel with UPN bigues protected by marine environment:
  • Approximate cost of materials: 15,000
  • Loading and unloading: €800
  • Transport and travel on the Bloc: €18,000
  • Reforç d’ancoratges del Bloc: €2,000
  • Drafting of the implementation project: €10,000
  • Total approximate cost: €45,800
  • Please bear in mind that the value of the metal in the markets at the time of purchase could fluctuate the price.
  • It is necessary to maintain the sculpture every 5 years with an approximate cost of €10,000.

Nova Alpha and Omega

  • It is made up of a metallic structure of 12 meters in height and approximately 6,900 kilograms. It is proposed to manufacture it with 15/20 mm thick carbon steel sheets and protected with two epoxy caps and one of polyurethane for structures that are attached to:
  • Approximate cost of materials: €85,000
  • Loading and unloading: €1,500
  • Special transport from the factory: €2,000
  • Muntatge i col·located on the Bloc: €40,000
  • Reforç d’ancoratges del Bloc: €10,000
  • Drafting of the implementation project: €15,000
  • Total approximate cost: €153,500
  • Please bear in mind that the value of the metal in the markets at the time of purchase could fluctuate the price.
  • It is necessary to maintain the sculpture every 5 years with an approximate cost of €20,000.

Related Articles

Leave a Reply

Your email address will not be published.

Back to top button